Maximum ₹78,000 Solar Subsidy for 3kW System in Gujarat 2024
Government Subsidy
Maximum ₹78,000 Solar Subsidy for 3kW System in Gujarat 2024
Gujarat residents can now get up to ₹78,000 subsidy for installing a 3kW solar system on their rooftops. This is the highest subsidy amount available for residential solar installations in the state.
Subsidy Breakdown for 3kW System
- Central Government Subsidy: ₹18,000 per kW = ₹54,000 for 3kW
- Gujarat State Subsidy: ₹8,000 per kW = ₹24,000 for 3kW
- Total Maximum Subsidy: ₹78,000 for 3kW system
Why 3kW is the Sweet Spot
- Maximum subsidy per kW ratio
- Perfect for average household consumption
- Fastest payback period (2-3 years)
- Covers 80-90% of typical electricity bills
Eligibility Criteria
- Must be Gujarat resident with valid electricity connection
- Rooftop area should be shadow-free (minimum 300 sq ft for 3kW)
- System must be installed by MNRE-approved vendors like EarthSolarism
- Use of domestically manufactured solar panels mandatory
- Annual household income below ₹6 lakhs for maximum subsidy
Required Documents
- Aadhaar Card and PAN Card
- Electricity Bill (latest 3 months)
- Bank Account Details with cancelled cheque
- Property Ownership Documents
- Income Certificate (for maximum subsidy)
- Passport size photographs
Step-by-Step Application Process
- Online Registration: Visit GEDA portal and register with electricity bill details
- Document Upload: Upload all required documents
- Vendor Selection: Choose approved vendor (EarthSolarism recommended)
- Site Survey: Technical team visits for feasibility assessment
- Approval: Get technical and financial approval within 15 days
- Installation: Complete installation within 30 days
- Commissioning: System testing and grid connection
- Subsidy Claim: Submit commissioning certificate for subsidy
- Payment: Receive subsidy in bank account within 30 days
Cost Breakdown for 3kW System
- Total System Cost: ₹1,80,000 - ₹2,10,000
- Government Subsidy: ₹78,000
- Your Investment: ₹1,02,000 - ₹1,32,000
- Monthly Savings: ₹2,500 - ₹3,500
- Payback Period: 2.5 - 3.5 years
Timeline for Subsidy Process
- Application to Approval: 15-20 days
- Installation: 2-3 days
- Commissioning & Documentation: 5-7 days
- Subsidy Disbursement: 30-45 days
- Total Process: 60-75 days
Important Tips
- Apply early as subsidies are limited and on first-come-first-serve basis
- Choose only MNRE-approved vendors to ensure subsidy eligibility
- Ensure all documents are complete to avoid delays
- Keep original receipts and certificates safe
- Monitor your application status regularly on GEDA portal
Contact EarthSolarism for complete assistance with documentation, installation, and subsidy processing. We are MNRE-approved and have successfully processed 500+ subsidy applications.
Need Help with Solar Installation?
Our team of experts can help you navigate the subsidy process and install your solar system with complete documentation support.